Houses built before 1960
About 74 percent of the village's homes were built before 1960, and close to 87 percent are detached single-family houses, by 2024 Census estimates.
Miami-Dade County
Nearly three in four Miami Shores homes went up before 1960, and most still drain to a septic tank. Call when water or sewage gets in, and it's cleared out.
ZIP codes in the area
Some of these ZIP codes also include neighboring communities.
Miami Shores Village sits on Biscayne Bay between Little River and North Miami. The Shoreland Company laid it out in 1924, sold it as “America’s Mediterranean” and specified Mediterranean Revival homes, and the village was incorporated on January 2, 1932. Today it is mostly single-family houses on septic, the bulk of them built in the 1940s and 1950s. Water damage here usually comes from old plumbing, a backed-up septic tank, or the canal and the bay on the east side.
About 37 percent of homes in the village went up in the 1950s, another 22 percent in the 1940s and about 15 percent before 1940. Barely one home in a hundred is newer than 2010. In houses that old, the plumbing has usually been repaired in pieces, so a 1950s drain line can run right beside a newer supply line.
A water heater in the garage or a laundry room off the kitchen leaks onto the slab, and the water slides under baseboards into the next room. A supply line inside a wall can drip for weeks and show up only as bubbling paint or a soft spot in the floor trim. Signs of hidden water damage lists what to look for, and if the heater is the source, a leaking water heater covers the first steps.
On the visit, moisture meters and a thermal camera trace the wet area through the walls and floor. Only the wet sections get opened, which counts for more in a house with original plaster or wood floors.
Biscayne Times reported in August 2026 that more than 90 percent of Miami Shores properties still run on septic, citing the village’s 2022 strategic plan, which calls the village low-lying and especially vulnerable to flooding. The village started its conversions in Shores Estates, 99 homes near the country club and the C-8 canal, because the neighborhood floods. The village said the new lines, tied into North Miami’s wastewater system, would address residents’ sewer backup problems. The village manager told the paper the next project would cover 240 homes in southeastern Miami Shores.
Everywhere else, a septic tank in soaked ground after days of rain can’t drain, and the overflow comes up through the lowest tub, shower or floor drain. That’s sewage cleanup: carpet, pad and anything porous the sewage touched comes out, and the hard surfaces are disinfected before any drying. Not sure if what came up counts as sewage? Clean, gray and black water explains the categories.
The village’s flood page says heavy, prolonged rain can exceed the drainage system and its canals, and its mitigation list is specific about where. The residential streets around NE 104th and NE 105th Street flood during heavy rain, high tides and king tides. The Bayshore Drive pump station took saltwater damage in Hurricane Irma, and a new, higher seawall is going in at Bayfront Park.
On October 27, 2026, the record king tide pushed seawater over the water management district’s barrier on the canal near the golf course’s 12th hole and shut the course for days. When bay or canal water gets inside a house, it’s flood cleanup, because the water carries salt, silt and whatever washed in off the street. King tides and street flooding covers why the fall tides do the most damage.
Every Miami Shores address in 33138, 33150 and 33153 is covered, Shores Estates included. Don’t see your ZIP? Call anyway and we’ll check your address.
When you call, tell us whether the house is on septic or sewer, roughly when it was built and where the water came in: a pipe, a drain or the yard.
About 74 percent of the village's homes were built before 1960, and close to 87 percent are detached single-family houses, by 2024 Census estimates.
More than 90 percent of Miami Shores properties still use septic tanks, according to the village's 2022 strategic plan as reported by Biscayne Times. The first residential sewer conversion, 99 homes in Shores Estates, is now substantially complete.
The village has listed a water control system and a new seawall on the C-8 canal behind the former Kmart property on NE 105th Street to keep canal water out of the roads and homes there.
Seawater topped a South Florida Water Management District barrier near the 12th hole of the village golf course and backed into the canal during the October 27, 2026 king tide, the Miami Herald reported.
Services
FAQ
Yes. Miami Shores addresses in 33138, 33150 and 33153 are all covered.
It can. A clog in the line between the house and the street pushes wastewater up the lowest drain the same way a full tank does. The cleanup is the same too, with anything soft that the water touched taken out and the floors disinfected before drying.
Mention it when you call. Original plaster, wood floors and old tile get dried in place wherever the moisture readings show they can come back, and anything that has to come out is photographed first.
Not all of it. Drywall gets cut a short distance above the highest wet line, and the wall cavity behind it is cleaned and dried. Brackish water leaves salt and silt behind, so the slab and the lower walls are scrubbed before the drying equipment goes in.
Call now
Shut off the water if you can reach the valve safely, then call. Describe where it came from and which rooms are wet.
When you call, have ready